China Amends Moon Plans, Aims For Satellite Launch By End Of 2007 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, May 21, 2007

China Amends Moon Plans, Aims For Satellite Launch By End Of 2007

Rover Mission Planned For 2012

China intends to send a lunar orbiter skyward later this year, the first step towards launching a moon lander and, eventually, a lunar rover, according to news reports.

China's Xinhua news service quoted Sun Laiyan, director of China's National Space Administration, in his speech Sunday at Beijing Jiaotong University

"The moon probe project is the third milestone in China's space technology after satellite and manned spacecraft projects, and a first step for us in exploring deep space," Sun said, according to Reuters.

Aero-News reported on China's plans to send a satellite into lunar orbit last year. At the time, CNSA planned to launch the first satellite by April 2007; plans now call for the launch to occur sometime before the end of the year.

Future mission plans for the Chinese space program could be described as "pragmatic," with a moon rover mission reportedly planned for 2012, Xinhua reports. After launching a two-man Earth orbital mission in October 2005, CNSA plans to launch a spacewalk mission sometime in 2008.

Sun also said China will develop 12 Beidou ("North Dipper") satellites, with some to be used in the country's development of a global navigation system rivaling the United States' GPS system.

FMI: www.cnsa.gov.cn/n615709/cindex.html

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC