Gulfstream G200 Maintenance Program Receives Approval | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Aug 08, 2006

Gulfstream G200 Maintenance Program Receives Approval

OK'd by FAA, Israeli CAA

Gulfstream has received approval for a new version of its G200 MSG-3 scheduled maintenance program, from both the FAA and the Israeli Civil Aviation Administration.

The new MSG-3 program significantly reduces the number of required scheduled maintenance tasks while retaining the highest level of safety standards as defined by Federal Aviation Regulations ( FARs ). MSG-3 is the acronym for the Maintenance Steering Group – 3 rd Task Force, which developed the industry standard process to evaluate maintenance programs. Using historical reliability data of the G200, the new MSG-3 program continues to maintain aircraft reliability while extending maintenance intervals.

“With extended intervals between maintenance checks and fewer required tasks, the G200 MSG-3 program significantly reduces an aircraft owner’s operating expenses while increasing the aircraft’s availability,” said Larry Flynn, president, product support, Gulfstream Aerospace.

Operators whose G200 business jets are maintained through the new G200 MSG-3 program significantly extend their maintenance intervals to 500 flight hours for an “A” check and every 12 months for a “C” check. In comparison, G200 aircraft maintained under the previous maintenance program were required to go in for service every 300 flight hours.

The new MSG-3 program’s emphasis on safety also allowed for a reduction in the number of Certification Maintenance Requirements, those essential tasks required to maintain airworthiness, from 40 tasks to seven.

G200 operators who fly their aircraft an average of 1,000 hours a year and adopt the new G200 MSG-3 program will reduce the number of scheduled maintenance tasks from 455 to 72 in the first year alone. Over a four-year period, the tasks would be reduced from 2,161 to 464.

Gulfstream has developed a no-cost service bulletin, SB 200-05-280, for G200 operators who wish to convert their aircraft to the new MSG-3 scheduled maintenance program.

Gulfstream notes that the new G200 MSG-3 program was developed with the same methodology as their existing MSG programs for GV-series aircraft – G550, G500 and GV; GIV-series aircraft – G450, G350, G400, G300, GIV-SP, GIV; and the Gulfstream G150, which will enter service this quarter.

FMI: www.gulfstream.com, www.generaldynamics.com

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC