Quito, Ecuador Schedules Runway Maintenance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Mar 21, 2024

Quito, Ecuador Schedules Runway Maintenance

Maintenance Planned Well in Advance for Equatorial Aerodrome

Ecuador's Mariscal Sucre Quito International Airport has announced a few chunks of downtime for runway maintenance, describing some taxiway work and mainline repairs that will put the airport out of commission for windows in May, June, July, and September.

The maintenance work will cover more than 70,000 square meters of runway, helping to prevent emergency corrective work should existing wear and tear worsen in the future. Right now, they've scheduled a few windows: May 11th, May 18th; June 1st, July 6th, July 13th, July 20th, and September 7th,14th and 21st from 0200 hrs to 1200 hrs. A few more days have a different window, however, with June 8th, 15th, 22nd, and 29th seeing closures from 0200 hrs to 1400 hrs.

"The aerodrome closures have been coordinated and authorized by the General Directorate of Civil Aviation," Quiport Corporation, the airport's overseer, explained. "The airlines that operate at the Quito airport have already been informed of this need by Quiport and the DGAC through the respective NOTAM." The corp says that passengers planning a flight into Quito on the affected dates should already have their carriers touching base to clear up any issues already, but numbers and details can be found on their list of Quito attendees. 

"Quiport will also carry out maintenance work on taxiways A and B, which will not affect air operations, but which, together with the work on the runway, are necessary to keep the airport facilities in optimal condition."

FMI: www.aeropuertoquito.aero

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC