Santa Barbara Airport Studies FBO Expansion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Sep 07, 2019

Santa Barbara Airport Studies FBO Expansion

Project Would Include Redesign Of Existing Facilities

The Santa Barbara, CA Municipal Airport (KSBA) has launched a study that could lead to an expansion of FBO services at the field.

Noozhawk reports that airport officials are planning to reconfigure its FBO offerings beginning in 2022, which could result in a new FBO being added to the field supporting GA.

Currently, Signature Flight Support and Atlantic Aviation operate at KSBA. A third FBO, ACI Jet, has expressed interest in setting up shop at the airport.

The project has been called one of the most complex the airport is likely to undertake since a new airline terminal was designed. Deanna Zachrisson, the business development manager for the airport, said the project would make a "lasting difference", serving GA for the next 30 years, and lead to FBOs developing their own vision for the airport and the local aviation community.

The plan is being driven by a surge in airline operations at the airport, reducing the space available for GA. KSBA has added four commercial air carriers serving five non-stop destinations since 2016, according to the report. The plan would move both existing FBOs to the north side of the airport. Atlantic Aviation currently is located on the southeast side of the field.

Airport Director Henry Thompson said the analysis is focusing in part on what is the right mix of GA, cargo and commercial operations at KSBA. "It is going to be a balancing act to determine the exact amount," he said.

Officials anticipate the completion of a financial analysis of the project later this year, and that an RFP will be issued early in 2021. Negotiations and groundbreaking for the project are currently forecast to begin in 2022.

FMI: Source report

Advertisement

More News

Airborne 05.20.24: Van's BK Exit, Bud Anderson, Air Race Classic

Also: ALPA Warns, Aviation Meteorology Reference, Jennifer Homendy Re-Ups, CAF Tampa Bay The court has approved Van's Aircraft's bankruptcy reorganization plans, settling a stressf>[...]

Airborne 05.20.24: Van's BK Exit, Bud Anderson, Air Race Classic

Also: ALPA Warns, Aviation Meteorology Reference, Jennifer Homendy Re-Ups, CAF Tampa Bay The court has approved Van's Aircraft's bankruptcy reorganization plans, settling a stressf>[...]

ANN's Daily Aero-Term (05.18.24): Flameout Pattern

Flameout Pattern An approach normally conducted by a single-engine military aircraft experiencing loss or anticipating loss of engine power or control. The standard overhead approa>[...]

ANN's Daily Aero-Linx (05.18.24)

Aero Linx: VC-25 - Air Force One The mission of the VC-25 aircraft — Air Force One — is to provide air transport for the president of the United States. The presidentia>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC