Navy Conducts COBRA Flight Test From Fire Scout UAV | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Oct 23, 2010

Navy Conducts COBRA Flight Test From Fire Scout UAV

AN/DVS-1 COBRA System Allows MQ-8B To Conduct Unmanned Aerial Recon In Littoral Areas

The Navy successfully conducted the first flight test of the Coastal Battlefield Reconnaissance and Analysis (COBRA) Block I system at Yuma Proving Ground, AZ on October 13, testing the system's performance on the MQ-8B Fire Scout vertical take-off unmanned aerial vehicle. The AN/DVS-1 COBRA system allows the MQ-8B to conduct unmanned aerial reconnaissance in littoral areas, detecting minefields and obstacles to prepare for amphibious assaults. The Block I upgrade was designed to specifically address the beach zone and inland areas.


Fire Scout UAV During COBRA Test Navy Photo

"COBRA will provide valuable minefield, obstacle, and bathymetry information to the warfighter and amphibious task groups; information which is critical to amphibious assault planning," said Capt. John Hardison, Mine Warfare Programs deputy program manager. "Successful completion of these tests is a significant leap forward in delivering this capability."

The Fire Scout, equipped with COBRA, conducted integration testing and flew for approximately 2 1/2 hours. Several successful tracks were completed in both pre-planned and operator-controlled modes, and the systems conducted simulated missions. Takeoff and landing went without incident, and the system completed all test scenarios.


Fire Scout UAV File Photo

With the successful completion of the first COBRA flight on Fire Scout, the system moves closer to delivery and deployment. The COBRA Block I system will enter low-rate initial production under a Small Business Innovative Research (SBIR) Phase III contract. Under this contract, the first production unit is scheduled for delivery to the fleet in fiscal year 2012.

FMI: www.navy.mil

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC