Boeing And USAF Adjust KC-46 Tanker Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Jun 01, 2016

Boeing And USAF Adjust KC-46 Tanker Schedule

Formal Production Decision Moved Back Two Months

The U.S. Air Force is moving its formal production decision on the KC-46 tanker program - known as Milestone C - from June 2016 to August 2016 to allow additional time to implement the solution to a refueling boom loads issue identified during flight testing earlier this year, according to Boeing.

The Air Force has also released an updated projection from Boeing for initial KC-46 deliveries and the expected timing for delivery of the first 18 certified tanker aircraft, a milestone known as Required Assets Available (RAA). Due to ongoing complexities associated with qualification and certification of the aircraft’s centerline drogue and wing-aerial refueling pod (WARP) systems, and the previously announced higher volume of change incorporation to bring the first 18 aircraft up to the certification configuration, the first tanker delivery will move from March 2017 to August 2017 with the 18 th aircraft delivered in January 2018.

The underlying production system remains on track, and Boeing says it will have more than 18 aircraft through the factory line and in various stages of final change incorporation and certification by August 2017. The first 18 aircraft will be equipped with refueling boom and centerline drogue refueling capabilities as well as all other contract required capability except WARPs. The WARP systems required to complete full contractual RAA will be delivered separately in October 2018.

Boeing says it has 5 aircraft now in test (including the first production aircraft), 7 aircraft in final production build, and 8 aircraft in the supply chain – up to tail number 20. The KC-46 Tanker will play a vital role in America’s Air Mobility Forces providing both global power projection and unrivaled global reach for decades to come.

(Image provided with Boeing news release)

FMI: www.boeing.com, www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC