NASA's Orion Spacecraft Powers through First Integrated System Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Apr 16, 2014

NASA's Orion Spacecraft Powers through First Integrated System Testing

Spacecraft Powered On For 26 Consecutive Hours During Final Testing

NASA's Orion spacecraft has proven its mettle in a test designed to determine the spacecraft's readiness for its first flight test -- Exploration Flight Test-1 (EFT-1) -- later this year. The spacecraft ran for 26 uninterrupted hours during the final phase of a major test series completed April 8 at the agency's Kennedy Space Center in Florida. The test verified the crew module can route power and send commands that enable the spacecraft to manage its computer system, software and data loads, propulsion valves, temperature sensors and other instrumentation.

"This has been the most significant integrated testing of the Orion spacecraft yet," said William Gerstenmaier, associate administrator for NASA's human exploration and operations at the agency's Headquarters in Washington. "The work done to test the avionics with the crew module isn't just preparing us for Orion's first trip to space in a few months. It's also getting us ready to send crews far into the solar system."

In October 2013, NASA and Lockheed Martin engineers powered on Orion's main computer for the first time. Since then, they have installed harnessing, wiring and electronics. This was the first time engineers ran the crew module through its paces to verify all system actuators respond correctly to commands and all sensors report back as planned. More than 20 miles of wire are required to connect the different systems being powered.

"Getting all the wiring right, integrating every element of the avionics together, and then testing it continuously for this many hours is a big step toward getting to deep space destinations," said Mark Geyer, Orion program manager.

Engineers now are preparing the crew module for vibration testing, scheduled for the week of April 14. In May, the heat shield will be installed and, shortly thereafter, the crew module will be attached with the service module.

During EFT-1, an uncrewed Orion spacecraft will take a four-hour trip into space. During its reentry into Earth's atmosphere, Orion will be traveling at 20,000 mph, faster than any current spacecraft capable of carrying humans, and endure temperatures of approximately 4,000 degrees Fahrenheit. The data gathered during the flight will inform design decisions to improve the spacecraft that will one day carry humans to an asteroid and eventually Mars. EFT-1 is targeted for launch in December.

(Images from file)

FMI: www.nasa.gov/orion

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC