F-16s Need, Get Once-Over | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 23, 2003

F-16s Need, Get Once-Over

For every 300 hours an F-16 Fighting Falcon spends in the air, it is required to go through an inspection.

The F-16s at a forward-deployed location have been flying almost continuously since the beginning of Operation Iraqi Freedom, making these inspections, called phases, necessary more frequently.

So frequently, in fact, that the F-16 phase crews of the 363rd Expeditionary Maintenance Squadron have been working nonstop to keep up with the pace. The squadron is made up of airmen deployed from Misawa Air Base, Japan, and Shaw Air Force Base (SC).

According to Tech. Sgt. Scott Hooks, the phase dock chief for the Misawa aircraft, a normal 300-hour phased inspection takes about five days at home station. "Right now we're putting one out every three and one-half days," he said. "That's 3.6 phases per week."

The crew from Shaw AFB has been keeping right up with them. "We arrived in February, and we were doing a phase two days later," said Staff Sgt. Scott Kennett, the night shift dock chief for Shaw phase. "We have only had one two-day break since we got here."

Kennett said the Shaw aircraft have done the equivalent of 11 months of flight hours in the last two months.

Inspections may not sound like a tough job to some people, but there is a lot involved since phases are required to keep the aircraft ready to perform the mission.

"We treat phase as a preventive maintenance environment," Hooks said. "If it's not broken yet, but looks like it might before the next 300-hour inspection, we go ahead and fix it. We catch all the little things that wouldn't normally be seen during a regular preflight inspection."

The standard checks done during a phase include a rig and operations check on the landing gear. This requires the aircraft to be jacked up and stabilized. Then, some jets need their engine removed. "We do that right off the bat," Hooks said.

Next, the crew changes all oil and fuel filters, checks for cracks in flight control surfaces, and looks for bushing wear and corrosion.

Once all the inspection workcards are finished and everything that needs fixing has been fixed, the plane rolls out for operational checks of its systems before returning to service.

Compressing this process from the normal five days into three has not been easy, but Hooks said his crew has been "awesome."

"It's easy to be a leader when you've got good followers," he said. "They're just like anyone -- they miss home and family -- but they understand why we're here. They're proactive, motivated and stick together as a team."

[Thanks to Tech. Sgt. Christopher Ball, 363rd Air Expeditionary Wing Public Affairs --ed.]

FMI: www.af.mil

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC