Don't Expect A Quick Return To Production At Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Nov 05, 2008

Don't Expect A Quick Return To Production At Boeing

May Be Weeks Before Lines Are Running... And Don't Plan On The 787 Flying Until Next Year

The machinists strike may be over at Boeing.... but that doesn't mean airplanes are rolling smoothly off the line just yet.

The Seattle Post-Intelligencer reports it may be two weeks before some assembly lines are up and running. While many of the Machinists undergo required recertification, necessary preparations are being made to restart production.

Boeing had said early in the strike that it would issue revised guidance to investors, and updated delivery predictions to customers, after the strike ended. One industry analyst predicted Monday the first flight of the 787 Dreamliner, scheduled before the end of this year before the strike hit, could now be delayed until February or March... and first deliveries to customers pushed off into the second quarter of 2010.

And that assumes the company doesn't suffer a strike by 21,000 members of the Society of Professional Engineering Employees in Aerospace. Their contract ends December 1st, and Boeing says it will present its final offer to the union by November 11.

A strike by SPEEA wouldn't completely shut down jet production... but could disrupt deliveries, and further delay the assembly of 787 development aircraft at Boeing's plant in Everett, WA.

Analysts think Boeing lost more than $2.6 billion in cash during the strike. The company says it will not raise output to make up for production lost during the 57 days the machinists stayed home.

FMI: www.boeing.com, www.goiam.org

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC