Despite Reports, Boeing Says 787 Still On-Track | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 24, 2007

Despite Reports, Boeing Says 787 Still On-Track

Analyst's Report Cast Doubt On May 2008 Timeframe

One day after seeing the its stock devalued on a report of imminent delays to its upcoming 787 Dreamliner program, Boeing went on the offensive Tuesday. Acknowledging at least some of the reports are correct, the American planemaker reaffirmed its pledge the Dreamliner will deliver on-time.

Boeing spokeswoman Yvonne Leach said Tuesday the 787 will meet its May 2008 delivery date, despite some parts suppliers being behind schedule.

As Aero-News reported, Wachovia financial analyst Joe San Pietro speculated problems with several 787 suppliers -- including Mitsubishi, which is making the aircraft's wings, as well as Italian rear fuselage supplier Alenia -- could lead to delivery delays of the popular composite-bodied airliner.

Wachovia's downgraded rating resulted in a one-day, three percent drop in Boeing's stock price.

While she wouldn't comment on all the reported supplier difficulties, Leach confirmed the first center wing box -- the portion of the center fuselage that holds the wings, that traveled from Fuji Heavy Industries in Japan to Global Aeronautica in Charleston, SC last week -- was sent without several preinstalled components. Those pieces included wiring and hydraulics systems.

Leach says Boeing has contingency plans that can help suppliers ramp up, and still meet the original timeframe.

Boeing will likely rely on those plans more than it may like, however... as San Pietro noted in his analysis due to Boeing's outsourcing of most of the 787's airframe, "Boeing has no internal capability to manufacture the major components."

That means the planemaker has little leverage over its suppliers... and leaves Boeing in a weakened position to threaten suppliers if they can't meet the deadline. That could very well spell trouble down the road.

For now, though, Boeing remains adamant its Dreamliner -- sales of which over the past two years have led to a resurgence for the planemaker -- will not fall prey to the same kinds of production delays that European rival Airbus has experienced with its A380.

We'll see... as Boeing is rapidly nearing crunch time for the new midsize jet, which is scheduled to later this year.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC