Committee Recommends Building New James City, VA Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 27, 2009

Committee Recommends Building New James City, VA Airport

But The New Facility Is A Long Way From Reality

After a year-long feasibility study, the James City Board of Supervisors' Community Airport Committee has recommended that the county build a new airport, rather than buy and operate Williamsburg-Jamestown Airport (pictured below).

The existing airport is privately owned, and does not meet certain FAA standards. That was one of the determining factors in the committees' decision to launch a site selection survey for a new airport. Extensive rehabilitation to Williamsburg-Jamestown Airport would be needed to bring it up to federal aviation standards.

FAA Airport Planner Jeffery Breedon told the The Newport News Daily Press that building a new airport is a lengthy and involved process which doesn't "just happen overnight". The site selection, environmental impact studies, design and layout, and land acquisition could take up to 20 years. And while federal money and state money ... up to 98 percent of the cost of either building a new airport or rehabbing the current one ... is available, the process is competitive, and the FAA can look more favorably on upgrading an existing airport. If no suitable land is found, the state of Virginia would want it's portion of the money back. County Administrator Sandy Wanner pointed out that there "is not a lot of land left in James City County". 

The committee estimated the cost of a new airport at $16 million just to complete the site study, acquire the land, and build a runway. That price tag does not include hangars, buildings, or other facilities. But Williamsburg-Jamestown Airport (JGG) would need extensive upgrades including a wider runway to bring it up to FAA standards, and a nearby landfill is also a problem. Those issues so far have been waived because the airport is privately owned.

The current airport is one like where many of us learned to fly. About 77 airplanes call Williamsburg-Jamestown Airport home, most of them single engine GA aircraft. The single 3200 foot runway handles about 22 thousand operations a year. There is an FBO, a restaurant, fuel, and pilot shop. It was established by Larry and Jean Waltrip in 1970. They have owned and operated it ever since, but Mr. Waltrip has announced his intention to retire.

Committee Chair Tucker Edwards told the Board of Supervisors "The airport is highly valued by the people who use it now".

FMI http://www.williamsburgairport.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC