Atlantis Team Confirms Shuttle Is 'Go' For Friday Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jun 07, 2007

Atlantis Team Confirms Shuttle Is 'Go' For Friday Launch

30 Percent Chance Of Weather-Related Delay

NASA reports at Wednesday's Launch Readiness News Conference, the Mission Management Team announced they were in agreement that Space Shuttle Atlantis is ready to fly on Friday.

"The team is ready to go and we're just really excited to be at this point after a very long and arduous spring and a lot of really hard work by the entire team," said LeRoy Cain, launch integration manager for the Space Shuttle Program. "I'm very proud of the team."

NASA Launch Director Mike Leinbach reported the countdown is going fine, and there no significant issues to report.

The forecast for launch day, according to US Air Force Lt. Col. Pat Barrett, weather officer from the 45th squadron, remains at a 30-percent chance of violating launch constraints. A high-pressure ridge is expected to move to the north, though, which could help clear out any thunderstorm activity over Kennedy Space Center.

Should that come to pass, it would mark one of the few times weather will have cooperated for the oft-delayed shuttle's launch.

Originally scheduled to fly in early March, Atlantis' trip to the International Space Station had to be put off following a late-February hailstorm at KSC. The hail chipped off hundreds of small fragments from the protective foam covering the shuttle's external fuel tank, requiring a series of innovative-but-time-consuming spot repairs.

Things are looking markedly better this time around, though. At 10:30 pm EDT Thursday, the protective rotating service structure will be rolled away from the space shuttle. External tank fuel loading is scheduled to begin at around 9:30 am EDT Friday.

As ANN reported Wednesday, launch countdown for Atlantis officially began at 9 pm EDT Tuesday, at T-43 hours. Included in the countdown is nearly 28 hours of built-in hold time prior to a targeted 7:38 pm EDT launch on Friday.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC