AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 30, 2007

AD: Boeing

AD NUMBER: PL2007-18-52
MANUFACTURER: Boeing
SUBJECT: Airworthiness Directive PL2007-18-52
SUMMARY:
Since the issuance of emergency AD 2007-18-51, we have received additional reports of parts coming off the main slat track downstop assemblies.

In these cases, the parts were found in the bottom of the slat track housing ("slat can"). Additionally, in one case, the slat can was damaged. Based on this new information, we find that the 24-day compliance time specified in AD 2007-18-51 for accomplishing the detailed inspection of each main slat track downstop assembly to verify proper installation of the slat track hardware is not adequate to address the unsafe condition.

We have determined that the appropriate compliance time for this inspection is 10 days after receipt of this new AD.

In addition, we have determined that an inspection using borescope techniques in lieu of a detailed inspection is acceptable.

Further, we have determined that by performing the initial detailed or borescope inspection within the reduced compliance time of 10 days, the compliance time for torquing the nut and bolt can remain at 24 days after receipt of AD 2007-18-51.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC