AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Aug 23, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-17-0

PRODUCT: Certain Bombardier, Inc., Model DHC-8-400 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-05-28, which applied to aircraft listed above.

AD 2014-05-28 required revising the maintenance or inspection program, as applicable.

This AD requires revising the maintenance or inspection program, as applicable, to include a revised task. This AD was prompted by a determination that the interval from Maintenance Review Board (MRB) task number 323100-202 should not be escalated, and that Certification Maintenance Requirements (CMR) task number 323100-102 should be applicable to all Model DHC-8-400 series airplanes, regardless of which main landing gear (MLG) up-lock assembly is installed.

DATES: This AD is effective September 25, 2018.

COST: The FAA estimates that this AD affects 69 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Revising the maintenance or inspection program takes an average of 90 work-hours per operator, although this number may vary from operator to operator. In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate. Therefore, total cost per operator is estimated to be $7,650 (90 work-hours x $85 per work-hour).
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC