More Than Just Wind in Airbus -Tunnel Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Jun 18, 2003

More Than Just Wind in Airbus -Tunnel Program

3D Systems Corp. announced just yesterday that Airbus in the United Kingdom purchased an SLA® 7000 system to produce components for wind tunnel testing at its operations in Filton, Bristol. The purchase of an SLA 7000 system will be used to create larger models with tighter tolerances and high quality surface finish in the wind tunnel.

"My background for the last 5 years has been on the test side where we are always under pressure to meet deadlines," said Martin Aston wind tunnel domain manager for Airbus in Filton. "We were already using 3D Systems technology through a third party service bureau and were aware of some of the advantages of stereolithography. If we are able to build models more quickly we can enter the design cycle later, which gives the aerodynamicist more time to think before committing to a test. We realized over a year ago, rather than outsourcing our prototyping and model production, that we needed to invest in new technology of our own if we were going to improve our cycle times without lowering our standards."

"We are currently using the SLA 7000 system for our Flight Physics which encompasses the aerodynamic groups who submit new geometries for testing in the tunnel. Typical components include leading edge and trailing edge configurations, flap tracks, pylons and nacelles. Having our own SLA system on-site allows us to react more quickly and more cost effectively to our bottom line," continued Aston. "We now try designs we never would have done before because we have the technology on-site. Effectively we can think of an idea, put it on the system to build overnight or over a weekend and test it the next day. If the design doesn't work we just repeat the process. To do that through a service bureau would be almost impossible as the typical turnaround time is four days."

Airbus has started experimenting with models that they would never have attempted or thought possible previously. Producing plastic models using the SLA system enables Airbus to cater for all of the shapes and curves of aircraft components. Geometric form and dimensional stability has been dramatically improved, which means the test data is more accurate. By having the technology on-site a deeper understanding of the process has been invaluable. This knowledge allows the project coordinator to define and control specific attributes of the geometry by understanding the technology. They can then communicate these constraints with the operator and part quality can be maintained.

"We no longer have the delay of waiting for returns if we need to build a new iteration, we simply re-run it on the SLA system," stated Aston.

FMI: www.3dsystems.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC