Australia Signs For New Air Tankers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Dec 21, 2004

Australia Signs For New Air Tankers

$1.4 Billion Deal Goes To EADS/Airbus/CASA Consortium

Australia's Defense Department has signed a $1.4 billion contract with EADS/CASA to provide the Royal Australian Air Force with five new air-to-air refueling aircraft, Defence Minister Robert Hill announced Monday.

"The new aircraft, to be known as Multi Role Tanker Transports, will be capable of refueling F/A-18, F-111, Airborne Early Warning and Control, and Joint Strike Fighter aircraft as well as having a significant strategic airlift capability," Senator Hill said.

"This contract signing is a significant step in replacing the Royal Australian Air Force's ageing Boeing 707 aircraft. The aircraft will be fitted with electronic warfare self protection equipment and training simulators will also be provided."

The new refueling aircraft will be based on the Airbus commercial A330 aircraft that is currently operated by Qantas as part of its commercial fleet.

The basic A330 aircraft will be produced in Europe with four of the five being modified and converted into MRTT aircraft by Qantas in Brisbane. Qantas will also provide the through life support for the MRTT aircraft.

"Australian industry will also be closely involved in the design work, project management, and production of aircraft components and engine parts for export," Senator Hill said.

"Work to be undertaken by Australian industry and the associated technology to be transferred to Australia is expected to exceed $500 million over the life of the MRTT aircraft."
The aircraft are scheduled to enter service in 2009. The contract schedule provides sufficient time for the aircraft to be extensively tested, facilities to be established and RAAF crews to be trained in order to ensure the MRTT capability is effectively introduced.

FMI: www.defence.gov.au

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC