UAVOS Tests New Two-Stage Parachute System For UAS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, May 01, 2020

UAVOS Tests New Two-Stage Parachute System For UAS

Designed To Help UAS Traveling At High Speeds

UAVOS has successfully tested its new two-stage parachute system, which is designed to help UAS traveling at high speeds slowly descend to the ground.

The system includes two parachutes: the pilot chute and the main chute used to slow and stabilize the UAS. The pilot chute allows the UAS to slowly descend safely during the main parachute deployment. It also allows the main chute to open up at a minimum altitude.

After the pilot chute opens, the main chute’s opening delay function causes the decrease in the load speed on the UAS. UAVOS says that the parachute system is designed for UAS that can travel at speeds of up to 280 miles per hour, and that weigh up to 110 pounds.

“In the aircraft safety developments, saving an entire aircraft through a deployable parachute system is a crucial thing,” says Aliaksei Stratsilatau, CEO and lead developer of UAVOS.

“These trials have generated an amount of data which allows us to quantify the performance of parachute system for future missions. Computer modeling cannot capture all the complexities. Parachutes encounter turbulent and dynamic airflow, which is almost impossible to replicate with computers. The only way to get a handle on all the possibilities is test.”

After landing, the group of the main parachute lines is automatically unfastened to collapse the canopy of the main chute and releases after touchdown to avoid the UAS being dragged along the ground.

Unfastening is carried out by the lock of a three-step release. During the first stage, the pilot chute is opened. During the second stage, the main chute is opened. During the third and final stage, the group of lines of the main parachute is released.

FMI: www.uavos.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC