NASA's Space Shuttle Discovery Set To Roll To Launch Pad | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Apr 02, 2005

NASA's Space Shuttle Discovery Set To Roll To Launch Pad

Space Shuttle Discovery is set to roll out to Launch Pad 39B at NASA's Kennedy Space Center (KSC), Fla. First motion is currently targeted for 12:01 a.m. EDT Tuesday, April 5.

The fully-assembled Space Shuttle Vehicle, or "stack," -- consisting of the orbiter, External Tank (ET) and twin Solid Rocket Boosters (SRBs) -- will be mounted on the Mobile Launcher Platform and delivered to the pad via a crawler transporter. The four-mile journey from the Vehicle Assembly Building (VAB) to the pad will take about six hours.

Discovery's initial move to Launch Pad 39B will be covered live on NASA Television. Live commentary will begin at the first motion of the crawler transporter and continue for about 30 minutes.

NASA TV is available via satellite in the continental U.S. on AMC-6, Transponder 9C, C-Band, at 72 degrees west longitude. The frequency is 3880.0 MHz. Polarization is vertical, and audio is monaural at 6.80 MHz. In Alaska and Hawaii, NASA TV is available on AMC-7, Transponder 18C, C-Band, at 137 degrees west longitude. The frequency is 4060.0 MHz. Polarization is vertical, and audio is monaural at 6.80 MHz. NASA TV is also available on the Internet at www.nasa.gov/ntv.

Launch of Discovery on its Return to Flight mission, designated STS-114, is targeted for May 15 with a launch window that extends to June 3.

During its 12-day mission, Discovery's seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.

Discovery was moved from Orbiter Processing Facility on March 29 to the VAB and attached to its propulsion elements, a redesigned ET and twin SRBs.

In preparation for rollout to the launch pad, work in the VAB included the installation of a new digital camera, testing electrical and mechanical attachments between the orbiter and ET, and umbilical checks.

FMI: www.nasa.gov/returntoflight, www.nasa.gov/ntv

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC