Sun, Aug 20, 2017
Hellas-Sat-4/SaudiGeoSat-1 Communications Satellite Moves To Final Assembly
A team of engineers and technicians at Lockheed Martin has completed the integration of the company's first modernized A2100 satellite. The spacecraft, known as Hellas-Sat-4/SaudiGeoSat-1, now moves into final assembly and testing, on track for launch in the second quarter of 2018.
Built for Arabsat and King Abdulaziz City for Science and Technology, Saudi Arabia, the satellite will provide advanced telecommunications capabilities, including television, internet, telephone and secure mode communications, to customers in the Middle East, Africa and Europe.
"We've modeled this activity in our virtual reality lab hundreds of times, but this is the first time we've performed the integration activity of our modernized A2100 satellite in a clean room," said Rick Ambrose, executive vice president of Lockheed Martin Space Systems. "Mating the scalable modules together in a precise method was a critical step for the program, and the team did an exceptional job."
This milestone on a modernized A2100 satellite sees the hybrid propulsion integrated with the payload module and transponder panels. Using a combination of electrical Hall current thrusters and liquid apogee engine, the propulsion subsystem serves as the structural backbone of the satellite and is essential for maneuvering it into its final orbit as well as keeping it on station throughout its mission.
The modernized A2100 builds on a flight-proven bus that is the foundation for more than 40 satellites in orbit today. Through an internally-funded, multi-year modernization effort, Lockheed Martin has enhanced the spacecraft's power, propulsion and electronics, while also adopting the latest advanced engineering and manufacturing techniques to decrease production costs and timelines. There are five modernized A2100 satellites currently under contract to Lockheed Martin. They are designed for a host of missions and customers around the globe.
(Image provided with Lockheed Martin news release)
More News
Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]
LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]
Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]
Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]
Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]