Payload Integrations Completed For Next Ariane 5 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 05.21.18

Airborne-UnManned 05.22.18

Airborne 05.16.18

AMA Drone Report 05.17.18

Airborne 05.18.18

Airborne-YouTube

Airborne 05.21.18

Airborne-UnManned 05.22.18

Airborne 05.16.18

AMA Drone Report 05.17.18

Airborne 05.18.18

Mon, Jul 02, 2012

Payload Integrations Completed For Next Ariane 5 Flight

Launch Scheduled For July 5th

The EchoStar XVII telecommunications platform has joined its MSG-3 co-passenger on Arianespace’s third Ariane 5 for launch in 2012, marking a key preparation milestone for this July 5 heavy-lift mission from the Spaceport in French Guiana. Encapsulated in its payload fairing, EchoStar XVII was lowered into place yesterday over the MSG-3 meteorological satellite – which was installed atop Ariane 5’s cryogenic core stage earlier in the week. The latest integration activity was performed inside the Spaceport’s launch vehicle Final Assembly Building.

With this new milestone, the Ariane 5’s dual payload “stack” has now been completed, clearing the way for final steps that will include functional tests, launch rehearsal and launch vehicle arming – followed by a readiness review and rollout to the Spaceport’s launch zone for an evening liftoff on July 5. Ariane 5 is to deliver a payload lift performance of more than 21,000 pounds. during the upcoming mission, which includes a combined total of over 16,500 lbs. for the EchoStar XVII and MSG-3 spacecraft, plus the launch vehicle’s dual-passenger dispenser system and satellite integration hardware.
 
EchoStar XVII – which is based on Space Systems/Loral’s powerful 1300 series satellite platform – will be operated by Hughes Network Systems, and it is to deliver broadband services to consumers, businesses and government customers across North America. Weighing approximately 13,448 lbs. at liftoff, the spacecraft employs a multi-spot beam, bent-pipe Ka-band architecture that provides significant additional capacity for Hughes.

MSG-3 was produced by an industry consortium led by Thales Alenia Space, for operation by EUMETSAT (the European Organisation for the Exploitation of Meteorological Satellites).  It has a liftoff mass of approximately 2,000 kg., and will operate in geostationary orbit after its deployment by Ariane 5 – providing highly detailed imagery of Europe, the North Atlantic and Africa for use by meteorologists and national weather forecasters.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

Airborne-Unmanned 05.15.18: UAS IPP Selections, Drone Regs, P4P V2.0

Also: DJI Microsoft Partner, ALPA 'Keeping A Close Eye', King Online Drone Course, Solar UAV First announced last October, this White House initiative partners the FAA with local, >[...]

Aero-News: Quote of the Day (05.20.18)

“We were honored to be selected by several airlines to create this retrofit solution for flight deck power. Our global experience in certification services is helping these a>[...]

ANN's Daily Aero-Linx (05.20.18)

Aero Linx: Directorate General of Civil Aviation (India) Directorate General of Civil Aviation is the regulatory body governing the safety aspects of civil aviation in India. This >[...]

ANN's Daily Aero-Term (05.20.18): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

AMA Drone Report 05.17.18: AMA Expo West Upgrades, UAS IPP, Amazon Snubbed

Also: Drones v Flaming Kites, Sherrif Drones, ALPA Is Watching..., Wichita Aviation Pathway After a number of years in Ontario, California; the highly anticipated 2018 rendition of>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC