Payload Integrations Completed For Next Ariane 5 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.04.15

Airborne 05.05.15

Airborne 04.29.15

Airborne 04.30.15

Airborne 05.01.15

Airborne Hi-Def On YouTube

Airborne 05.04.15

Airborne 05.05.15

Airborne 04.29.15

Airborne 04.30.15

Airborne 05.01.15

Mon, Jul 02, 2012

Payload Integrations Completed For Next Ariane 5 Flight

Launch Scheduled For July 5th

The EchoStar XVII telecommunications platform has joined its MSG-3 co-passenger on Arianespace’s third Ariane 5 for launch in 2012, marking a key preparation milestone for this July 5 heavy-lift mission from the Spaceport in French Guiana. Encapsulated in its payload fairing, EchoStar XVII was lowered into place yesterday over the MSG-3 meteorological satellite – which was installed atop Ariane 5’s cryogenic core stage earlier in the week. The latest integration activity was performed inside the Spaceport’s launch vehicle Final Assembly Building.

With this new milestone, the Ariane 5’s dual payload “stack” has now been completed, clearing the way for final steps that will include functional tests, launch rehearsal and launch vehicle arming – followed by a readiness review and rollout to the Spaceport’s launch zone for an evening liftoff on July 5. Ariane 5 is to deliver a payload lift performance of more than 21,000 pounds. during the upcoming mission, which includes a combined total of over 16,500 lbs. for the EchoStar XVII and MSG-3 spacecraft, plus the launch vehicle’s dual-passenger dispenser system and satellite integration hardware.
 
EchoStar XVII – which is based on Space Systems/Loral’s powerful 1300 series satellite platform – will be operated by Hughes Network Systems, and it is to deliver broadband services to consumers, businesses and government customers across North America. Weighing approximately 13,448 lbs. at liftoff, the spacecraft employs a multi-spot beam, bent-pipe Ka-band architecture that provides significant additional capacity for Hughes.

MSG-3 was produced by an industry consortium led by Thales Alenia Space, for operation by EUMETSAT (the European Organisation for the Exploitation of Meteorological Satellites).  It has a liftoff mass of approximately 2,000 kg., and will operate in geostationary orbit after its deployment by Ariane 5 – providing highly detailed imagery of Europe, the North Atlantic and Africa for use by meteorologists and national weather forecasters.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

AeroSports Update: Protect Your Aircraft From Theft

The Recent Alleged Theft Of A GA Airplane Should Remind Us To Use Adequate Antitheft Protection After the tragic event known as 9-11, safety precautions were placed in effect aroun>[...]

Airborne 05.05.15: UAV Vandalism, Ryanair Ripped Off, B-1 Upgrades

Also: United CEO Pay Raise, Aero-Calendar, Space Video Game, Frequent Flier Letdowns, Billion Dollar Cargo Suit, Honeywell/737MAX Indiscriminate use of small UAVs has posed a probl>[...]

Airborne 05.04.15: NBAA Acts On E Hampton, NASA's Messenger, Another 'Carplane?'

Also: Dreamliner AD, K-MAX, Building B737NGs, USAF In Nepal, Airbus Training Ctr, FAA SAFO According to the NBAA, town officials are poised to implement a set of noise and access r>[...]

Airborne 05.05.15: UAV Vandalism, Ryanair Ripped Off, B-1 Upgrades

Also: United CEO Pay Raise, Aero-Calendar, Space Video Game, Frequent Flier Letdowns, Billion Dollar Cargo Suit, Honeywell/737MAX Indiscriminate use of small UAVs has posed a probl>[...]

Continental Motors To Purchase Assets From Danbury

Acquires The Titan Brand Of Engines And Parts Continental Motors Group has entered into an agreement with Danbury Aerospace to purchase essentially all of the assets associated wit>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC