Payload Integrations Completed For Next Ariane 5 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 05.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.14.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Mon, Jul 02, 2012

Payload Integrations Completed For Next Ariane 5 Flight

Launch Scheduled For July 5th

The EchoStar XVII telecommunications platform has joined its MSG-3 co-passenger on Arianespace’s third Ariane 5 for launch in 2012, marking a key preparation milestone for this July 5 heavy-lift mission from the Spaceport in French Guiana. Encapsulated in its payload fairing, EchoStar XVII was lowered into place yesterday over the MSG-3 meteorological satellite – which was installed atop Ariane 5’s cryogenic core stage earlier in the week. The latest integration activity was performed inside the Spaceport’s launch vehicle Final Assembly Building.

With this new milestone, the Ariane 5’s dual payload “stack” has now been completed, clearing the way for final steps that will include functional tests, launch rehearsal and launch vehicle arming – followed by a readiness review and rollout to the Spaceport’s launch zone for an evening liftoff on July 5. Ariane 5 is to deliver a payload lift performance of more than 21,000 pounds. during the upcoming mission, which includes a combined total of over 16,500 lbs. for the EchoStar XVII and MSG-3 spacecraft, plus the launch vehicle’s dual-passenger dispenser system and satellite integration hardware.
 
EchoStar XVII – which is based on Space Systems/Loral’s powerful 1300 series satellite platform – will be operated by Hughes Network Systems, and it is to deliver broadband services to consumers, businesses and government customers across North America. Weighing approximately 13,448 lbs. at liftoff, the spacecraft employs a multi-spot beam, bent-pipe Ka-band architecture that provides significant additional capacity for Hughes.

MSG-3 was produced by an industry consortium led by Thales Alenia Space, for operation by EUMETSAT (the European Organisation for the Exploitation of Meteorological Satellites).  It has a liftoff mass of approximately 2,000 kg., and will operate in geostationary orbit after its deployment by Ariane 5 – providing highly detailed imagery of Europe, the North Atlantic and Africa for use by meteorologists and national weather forecasters.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

Aero-News: Quote Of The Day (05.19.13)

"There are a million reasons to pick the C-130J, as the Hercules continues to demonstrate the ability to fulfill any mission at any time. Not only is this milestone a testament to >[...]

ANN FAQ: Have You Tried The ANN News Ticker?

Several years ago, ANN's first web-geek, Al Pike, designed a small "portable" News Ticker that offers current ANN headlines detailing what is happening in the aviation world. It ca>[...]

ANN's Daily Aero-Linx (05.19.13)

Aero Linx: Aerospace Medical Association (AsMA) The Aerospace Medical Association (AsMA) is organized exclusively for charitable, educational, and scientific purposes. It is the la>[...]

ANN's Daily Aero-Term (05.19.13): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

Raytheon Delivers Electronic Jamming Capability For Gray Eagle UAS

Effort Will Mark First Time Army Has ECM Capability On Unmanned Aircraft Two electronic attack payloads in support of the U.S. Army's Networked Electronic Warfare, Remotely Operate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC