AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Jul 19, 2017

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2017-14-16

PRODUCT: Certain Bombardier, Inc., Model BD-100-1A10 airplanes.

ACTION: Final Rule; request for comments.

SUMMARY: This AD requires removing the fasteners attaching the machined center fitting to the rear spar frame lower flange splice, inspecting the fasteners and fastener holes for damage, reworking and repairing the fastener holes, as applicable, and replacing the fasteners.

This AD was prompted by a report indicating that certain fasteners attaching the machined rear spar center fitting to the frame were installed with a gap between the fastener head and the structure, or were installed tilted.

This AD is estimated to affect 187 aircraft of U.S. registry. The FAA estimates that it will take about 37 work-hours per product to comply with the basic requirements of this AD and 1 work-hour per product for reporting. The average labor rate is $85 per work-hour. Required parts will cost about $15,150 per product. Based on these figures, we estimate the cost of this AD on U.S. operators to be $3,437,060, or $18,380 per product.

According to the manufacturer, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. The FAA does not control warranty coverage for affected individuals. As a result, all costs have included in the cost estimate.

DATES: This AD becomes effective August 1, 2017. Comments must be received by August 31, 2017.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC