HeliExpo '05: Up And Away... VMX-22 Resumes Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Feb 08, 2005

HeliExpo '05: Up And Away... VMX-22 Resumes Flights

Ospreys To Take Part In Operational Evaluation

The last of the MV-22 Osprey's that will take part in an upcoming operational evaluation was recently flown from Amarillo, TX, to Marine Tiltrotor Test and Evaluation Squadron-22(VMX-22) in North Carolina.

The aircraft arrived to the squadron ready for full flight operations.

The addition of the recent arrival to VMX-22's inventory has enabled the squadron to resume flights beginning today while awaiting spare parts for its remaining aircraft.

Last month the squadron discontinued flights at the direction of Col. Glenn M. Walters, commanding officer of VMX-22, in order to avoid risking a reduction in spare supply on a part of the aircraft called the proprotor gearbox.

Prior to Walter's decision, flaking of the thin dense chrome on the input quills within the proprotor gearbox and improper torquing of a part within the proprotor gearbox caused a chip light indicator to go off in several of the MV-22 Ospreys. While flights at VMX-22 could have resumed, the decision to continue flying the aircraft could have lead to the eventual need to replace the entire proprotor gearbox rather than only replacing the input quill within the proprotor gearbox.

 Flights of the V-22 in Amarillo, TX, Edwards Air Force Base, CA and Patuxent River, MD, were not affected by last month's decision. Pending the arrival of the new input quills, VMX-22 will fly the remaining aircraft.

With the arrival of the latest aircraft, VMX-22 will continue to train personnel as current, qualified and proficient in the aircraft in order to prepare for operational evaluation.

VMX-22 will fly up to eight aircraft more than 500 hours during operational evaluation.

FMI: www.usmc.mil

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC