NASA Investigating Unexplained Power Loss Aboard ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Feb 12, 2007

NASA Investigating Unexplained Power Loss Aboard ISS

Teams Assessing Affected Systems

NASA says mission control teams are assessing systems affected by a power loss aboard the ISS over the weekend.

Early Sunday morning one of the power channels on the P4 solar array electrical system dropped out when a DC switching unit failed. The switch controls power from the solar array to batteries and other components on the station.

The lost power channel briefly cut ISS communication with mission control, and shut down control moment gyroscope #2, one of the station's three remaining attitude control gyros. Other ancillary equipment such as science facilities were also affected.

NASA says the crew and station were never in danger. The crew and controllers never lost orientation control of the station which continued operating on its #1 and #4 gyros -- #3 gyro was previously shut down awaiting repair.

Flight controller were able to restore power to nearly all affected systems by Monday morning and are currently investigating what the agency believes to be an isolated incident.

The crew of expedition 14 -- commander Michael Lopez-Alegria and flight engineers Sunita Williams and Mikhail Tyurin -- are preparing for the next spacewalk scheduled for February 22. Lopez-Alegria and Williams completed their third of three recent spacewalks last Thursday (Williams photographed herself in the picture below) prepping the station for further exterior work during missions STS-118 and STS-120 later this year.

During the next spacewalk -- for which the crew will use Russian procedures -- Lopez-Alegria and Tyurin will service an antenna on the Progress 23 cargo ship docked at the Zvezda service module.

After that spacewalk, the crew of expedition 14 will have completed five -- more than any other ISS crew.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC