Official: Navy Terminates VH-71 Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 01, 2009

Official: Navy Terminates VH-71 Contract

That's Pretty Much It... BuhBye!

The Navy has announced that it will terminate the VH-71 System Development and Demonstration (SDD) program contract. The announcement follows a Department of Defense (DoD) decision to cancel the existing presidential helicopter replacement program. The VH-71 was intended to replace both the VH-3D and VH-60N aircraft currently used to conduct presidential support missions.
 
Navy contract N00019-05-C-0030 and associated work with Lockheed Martin Systems Integration - Owego (LMSI-O), Owego, N.Y., awarded Jan. 28, 2005, for the SDD of the VH-71 program, has been terminated for the convenience of the government. 
 
The under secretary of defense for acquisition, technology and logistics issued a VH-71 program acquisition decision memorandum on May 15, 2009, which directed the program be cancelled, to include both Increment 1 and Increment 2.

Just a few days ago, Italian Defense Minister Ignazio La Russa pleaded for the Pentagon continue to go ahead with the VH-71 program. The VH-71 is based on the AW101 helicopter built by Italian firm AgustaWestland in Italy and the United Kingdom. In the letter to Gates, La Russa "expressed his concerns over the ongoing debate about the presidential helicopter, offered the assistance of the Italian government, and called for close cooperation by the manufacturer in order to find the most opportune way to successfully realize the program."

"The cancellation of the VH-71 program would negatively impact jobs and the industrial base in Italy and the U.K. It is fundamental for all allied countries to maintain a strong, autonomous defense industrial capability, and this program is a key element in the pursuit of that strategy."

FMI: www.defenselink.mil

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC