AeroSports Update: MVP Aero To Build A Prototype In Maine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jan 28, 2016

AeroSports Update: MVP Aero To Build A Prototype In Maine

The Minnesota Based Company Will Build The Prototype Of Its Multi-Capable Light Sport Aircraft At Brunswick Landing

When the MVP Aero multipurpose light sport airplane was introduced in its mockup stage at EAA AirVenture 2014, it was a showstopper. Designed for operation on land, water, and snow, it can also be used as a fishing boat or be converted into a camping tent.

The project has been underway for a while and has now developed to the point where MVP Aero has selected a location to build its first prototype, according to an article in the Bangor Daily News. According to the report, the prototype will be constructed at the former Navy Airbase at Brunswick Landing, Maine.

It’s reported that the Midcoast Regional Redevelopment Authority said that MVP Aero made the announcement of their decision to locate at Brunswick Landing at the U.S. Sport Aviation Expo in Sebring, Florida last week.

The article credits Paul Richards, MVP’s Director of Business Development, as saying the company picked the former Navy base because of its advanced airport facilities near the Androscoggin River and Casco Bay for testing the flying boat; local expertise both in composites and boatbuilding; and the ability to build the full prototype in the TechPlace building.

Apparently, this location has been decided on as the building location for the prototype but no firm decision has yet been made as to the location of the actual production facility.

The article cites Richards as saying the company estimates that will take about 18 months to two years to develop the prototype. The aircraft that has been seen at EAA AirVenture in 2014 and 2015 is not a prototype, it is an engineering mockup.

(Image from file)

FMI: Original source   www.mvp.aero

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC