GE Honda Aero Engines Begins Full Testing Of HF120 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 12, 2007

GE Honda Aero Engines Begins Full Testing Of HF120

Demo Powerplant Will Be Run Up To Maximum Thrust Levels

GE Honda Aero Engines tells ANN the enginemaker has begun testing the first full HF120 demonstration engine -- including maximum thrust levels -- at Honda's Aircraft Engine R&D Center in Japan.

Over the next five months, GE Honda will conduct an array of tests on several HF120 demonstrator engine builds to verify performance operability, thermal characteristics, and component efficiencies.

This full-engine testing follows several months of engine core (hot section) tests on several builds of hardware, as ANN reported in May.

GE Honda says the aggressive HF120 test schedule this year is geared to validate significant design enhancements to the engine before full certification testing begins in 2008. Currently, the company is finalizing and releasing hardware for the seven HF120 engines in the certification program.

"This is an exciting and intense period in the development program," said Bill Dwyer, president of GE Honda Aero Engines. "We are validating our latest design enhancements through as much core- and full-engine testing as possible before the first certification engines are assembled and tested."

The GE Honda H120 engine was formally launched in October 2006, when it was selected to power both the HondaJet advanced light jet and the Spectrum Aeronautical "Freedom" business jet. To date, more than 200 HF120 engines are on order.

HF120 certification is targeted for 2009, with entry into service on both aircraft scheduled to begin in 2010.

FMI: www.gehonda.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC