Payload Integration Underway For Arianespace's Year-Opening Ariane 5 Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jan 02, 2020

Payload Integration Underway For Arianespace's Year-Opening Ariane 5 Mission

Two Satellites Will Be Carried Into Orbit By The Launcher

Payload integration is underway for Arianespace’s first mission of 2020 – designated Flight VA251 – which will orbit satellites at the service of two long-time partners using an Ariane 5 launch vehicle.

Recent activity at the Spaceport in French Guiana included initial steps in creating the dual-payload configuration, with Eutelsat’s KONNECT satellite riding in the upper position. This involved installing the spacecraft atop Ariane 5’s SYLDA dispenser system during activity inside the launcher’s Final Assembly Building.

KONNECT will now be encapsulated by Ariane 5’s protective fairing, completing the payload configuration’s upper portion and readying it for positioning over co-passenger GSAT-30 once this spacecraft from the Indian Space Research Organization (ISRO) is installed atop the heavy-lift launcher.

Following Ariane 5’s liftoff from the Spaceport on January 16, KONNECT will be released into geostationary transfer orbit (GTO) first, followed by the separation of SYLDA – enabling GSAT-30’s subsequent deployment to GTO.

KONNECT – which was produced by Thales Alenia Space – is a new-generation high-throughput satellite that will deliver services across Europe and Africa. Featuring all-electric propulsion and configured for operation in Ka-band, it is the first to use Thales Alenia Space’s Spacebus NEO platform developed under the Neosat Partnership Project conducted by the European and French space agencies (ESA and CNES).

ISRO’s GSAT-30 was built using an I-3K satellite platform, and is to provide high-quality television, telecommunications and broadcasting services. It will have a liftoff mass of some 3,450 kg. and is to ensure continuity of service for India’s INSAT 4A, positioned at 83 deg. East longitude.

(Image provided withe Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC