Urgent CASA AD: BELL 206/158 Fuel Distribution System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 14, 2005

Urgent CASA AD: BELL 206/158 Fuel Distribution System

AD/BELL 206/158 Fuel Distribution System 8/2005DM

Applicability: Bell Helicopter Textron Canada (BHTC), Model 206 series helicopters as follows:

Model
206A
206B
Serial Numbers (S/N)
004 through 660 and 672 through 715
661 through 671 and 716 through 4586 and 5101 through 5305

Requirement: 1. Inspect the grounding of the fuel pumps and solenoid valve, as per instructions provided in Part I of Alert Service Bulletin (ASB) 206-05-103, dated 11 February 2005, or later revisions approved by the Chief, Continuing Airworthiness, Transport Canada.

2. Disconnect and stow the fuel purge hose, as per instructions provided in Part II of ASB 206 05 103 or later revisions approved by the Chief, Continuing Airworthiness, Transport Canada.

Note 1. Model 206A S/N 004 through 253 complying with Service Letter No. 206A 100, dated 20 March 1969, which installs a purge line to the drain valve, must comply with Requirement 2 of this Directive. If the Service Letter is not incorporated, the rotorcraft is not affected by Requirement 2 of this Directive.

Note 2. Model 206A/B S/N 004 through 2123 complying with Technical Bulletin 206 85 113, meets the intent of Requirement 2 of this Directive since the purge line is disconnected from the drain valve and stowed as required.

Note 3. Model 206B S/N 2124 and subsequent, are not affected by Requirement 2 of this Directive.

Note 4: Transport Canada AD CF-2005-10 refers.

Compliance:For Requirement 1 - Within the next 100 hours time in service, but no later than 10 July 2005.

For Requirement 2 - At the first occasion when aircraft is defueled, but not later than 1 December 2005.

This Airworthiness Directive becomes effective on 16 June 2005.

Background: Transport Canada has advised that inadequate electrical grounding of the fuel boost pump and the fuel drain solenoid valve, combined with fuel hoses contact, could cause arcing in the main fuel cell which may in turn cause an explosion and resultant fire.

This Directive requires a one time inspection to ensure correct grounding and, if necessary the disconnecting and stowage of the engine fuel purge hose.

FMI: http://casa.gov.au/airworth/airwd/NEW/urgent.htm

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC