First P-8A Poseidon Moves From Final Assembly To Preflight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Aug 14, 2008

First P-8A Poseidon Moves From Final Assembly To Preflight

Scheduled To Enter Service With US Navy In 2013

Boeing Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) employees gathered this week in Renton, WA to celebrate the completion of final assembly on the first P-8A Poseidon for the US Navy and its move to preflight work.

IDS and BCA are building the P-8A, a military derivative of the 737-800, on a third final assembly production line in Renton, home to commercial 737 production.

"We're proud to have completed final assembly on the first P-8A Poseidon," said Mo Yahyavi, vice president and P-8 program manager for BCA. "Our objective on the P-8 program is to provide the Navy with the world's most advanced maritime patrol and reconnaissance aircraft. BCA and IDS working together as one team will be able to do just that."

IDS will now focus on calibrating the flight-test instrumentation onboard the aircraft before moving it to Boeing Field in Seattle early next year for systems integration and additional testing.

"Program milestones, both big and small, are met daily thanks to our outstanding Poseidon team," said Bob Feldmann, vice president and P-8 program manager. "Since the start of final assembly in late March, the team has met all assembly milestones, including wing-to-body-join and start of the moving line in May, completion of full-power testing and engine installation in June and, most recently, engine run."

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.

FMI: www.boeing.com/ids, www.navy.mil

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC