Astronauts Add A Little Harmony To The ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Oct 26, 2007

Astronauts Add A Little Harmony To The ISS

Work Gets Underway On Construction-Intensive STS-120

NASA reports STS-120 Mission Specialists Scott Parazynski and Doug Wheelock wrapped up the first of five planned spacewalks Friday afternoon. During the six-hour, 14-minute excursion, the STS-120 and Expedition 16 crews successfully installed the Harmony module in a temporary location on the International Space Station, and prepared the P6 truss for its relocation.

The Italian-made Harmony module weights almost 16 tons, and when permanently installed will add over 2,500 cubic feet of habitation space to the ISS. It will also serve as the docking node for Japanese and European laboratories, scheduled for delivery over the next three shuttle missions.

The first spacewalk of STS-120 began at 0602 -- about a half-hour ahead of schedule, reports The Associated Press, all the better to briefly enjoy the view.

"You're not going to believe this," Parazynski told Wheelock as he opened the hatch, as they 122 nautical miles above the Andes and the Amazon rain forest of South America.

Mission Specialist Paolo Nespoli coordinated spacewalk activities. Mission Specialists Stephanie Wilson and Clay Anderson and Expedition 16 Flight Engineer Daniel Tani were at the controls of the station’s Canadian-built robotic arm.

Parazynski and Wheelock removed and stowed the S-band Antenna Structural Assembly which is being returned to Earth on Discovery. Next, they secured a Payload and Data Grapple Fixture onto Harmony that could not be in place during launch, removed contamination covers and disconnected the power cables linking Harmony to Discovery.

When the spacewalkers’ preparations were complete, the station robotic arm operators removed Harmony from the payload bay and moved it to its position on Unity. Meanwhile, the spacewalkers prepared the P6 truss for its relocation.

The two spacewalkers returned to the station at 1216 EDT. Four more spacewalks are scheduled for STS-120.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC