AD: Boeing 737-600 Through -900 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Oct 08, 2011

AD: Boeing 737-600 Through -900

AD NUMBER: 2011-20-10

MANUFACTURER: The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER Series Airplanes
SUBJECT: Airworthiness Directive 2011-20-10
ACTION: Final rule.

SUMMARY: This AD requires inspecting to determine the clearance and any wire bundle damage between wire bundle W443 and the left forward rudder quadrant, followed by adjusting the minimum clearance between the wire bundle and the left forward rudder quadrant, and repairing any wire bundle damage. This AD was prompted by reports of contact between wire bundle W443 and the left forward rudder quadrant. The FAA is issuing this AD to detect and correct contact between the wire bundle and the left forward rudder quadrant. Damage to the wire bundle from contact between the wire bundle and the left forward rudder quadrant could result in uncommanded stabilizer trim and autopilot disconnects due to shorted wires, potentially affecting the capability of the flightcrew during high work load and consequently reducing control of the airplane. Restricted movement of the rudder quadrant at full right rudder travel would reduce controllability of the airplane.

DATES: This AD is effective November 9, 2011.

FMI:  http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/F0918A7D3B0C2AF88625792000485EDB?OpenDocument

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC