STS-125: Three Out Of Five Spacewalks Successfully Completed So Far | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, May 17, 2009

STS-125: Three Out Of Five Spacewalks Successfully Completed So Far

"Batting 1000" To This Point

STS-125 mission specialists John Grunsfeld and Drew Feustel finished the mission’s third spacewalk Saturday at 4:11 p.m. EDT. The spacewalk lasted 6 hours, 36 minutes. During the endeavor outside the shuttle, Feustel and Grunsfeld removed the Corrective Optics Space Telescope Axial Replacement and installed in its place the new Cosmic Origins Spectrograph. They also completed the Advanced Camera for Surveys electronic card replacement work. The spacewalkers were ahead of schedule and were able to complete part 2 of the ACS repair, installing a new electronics box and cable.

Space shuttle Atlantis’ 11-day mission is the final shuttle flight to NASA’s Hubble Space Telescope. The seven-member crew will enhance the observatory and ensure cutting-edge science. The mission puts in place advanced technology that improves the telescope’s discovery power by 10 to 70 times. The five scheduled spacewalks will install new instruments and thermal blankets, repair two existing instruments, refurbish subsystems and replace gyroscopes, batteries and a unit that stores and transmits science data to Earth. The result will be six working, complementary science instruments with new capabilities, and an extended operational lifespan through at least 2014.

Saturday, the spacewalkers focused on the installation of the telescope’s new Cosmic Origins Spectrograph and completed the Advanced Camera for Surveys repair work. Engineers from the Space Telescope Operations Control Center at Goddard Spaceflight Center in Maryland powered up both components and reported good aliveness tests. More tests will be conducted during the astronauts sleep period.

On Sunday, starting at 9:16 a.m., astronauts Mike Good and Mike Massimino will repair the Space Telescope Imaging Spectrograph and install the New Outer Blanket Layer during the fourth STS-125 spacewalk.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC