ExoMars Performing Flawlessly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Mar 27, 2016

ExoMars Performing Flawlessly

Spacecraft En Route To Mars

Following a spectacular liftoff, ESA’s ExoMars Trace Gas Orbiter is performing flawlessly en route to the Red Planet.

The ESA–Roscosmos ExoMars Trace Gas Orbiter (TGO) and the Schiaparelli entry, descent and landing demonstrator are well on their way following the 14 March launch from Baikonur Cosmodrome in Kazakhstan.

After a 10 minute ascent, the three-stage Proton-M rocket delivered the Breeze-M upper stage and its ExoMars payload into an initial parking orbit.

Following four crucial engine burns in the next 10 hours, Breeze-M released ExoMars into its interplanetary path to Mars, achieving a departure speed accurate to within just 1.5 m/s. “We had an extremely precise orbital injection thanks to Proton–Breeze and our Russian colleagues, and we are now well on our way to Mars,” says ESA flight director Michel Denis.

“After the critical first few days in space, TGO is performing flawlessly. Over the next two weeks we will continue to check and commission its systems, including the power, communications, startrackers, and guidance and navigation system.”

Schiaparelli, which is hitching a ride to Mars with TGO, will also be thoroughly checked in the coming weeks.

Starting in April, the ExoMars team at ESA’s mission control centre in Darmstadt, Germany, will work with the science teams to start switching on and commissioning the craft’s scientific instruments.

NASA’s Electra radio relay will also be switched on and checked next month.

In June, the science control centre at ESA’s establishment near Madrid, Spain, will start working with the instrument teams at their various institutes, and the Roscosmos science operations centre, to perform a mid-cruise checkout of TGO’s instruments.

In the only problem seen so far, the team noted some hours after establishing a communication link that the temperature of the main engine, to be used later during the cruise and at Mars arrival, had started to rise more than expected.

In consultations with engineers from Thales Alenia Space France, TGO’s prime contractor, it was determined that simply adjusting the craft’s orientation in space by a few degrees so that the engine nozzle was no longer directly facing the Sun would do the trick. It did. “It’s obvious that the European industry who built ExoMars has done an excellent job,” says Michel.

By Thursday evening, 17 March, the mission control team had declared the ‘Launch and Early Orbit Phase’ – one of the most critical periods in any mission’s life – complete, and finished work in the main control room in Darmstadt.

From now on, routine operations will be handled from a smaller room, where space and facilities will be shared with other interplanetary missions.

(Images provided with ESA news release)

FMI: www.esa.int

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC