Fire Scout UAV To Be Tested Ahead Of LCS Deployment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Feb 25, 2008

Fire Scout UAV To Be Tested Ahead Of LCS Deployment

Navy Will Conduct Operational Evaluation Later This Year

The US Navy has decided to integrate Northrop Grumman's MQ-8B Fire Scout Vertical Takeoff and Landing Tactical Unmanned Aerial Vehicle (VTUAV) onto another air-capable ship before it reaches the Littoral Combat Ship (LCS). The Fire Scout is still slated to go aboard the LCS, and the Navy remains committed to transitioning the Fire Scout in that direction.

The Fire Scout is a key component of the LCS, designed to support mission areas of anti-submarine warfare, surface warfare and mine warfare. Northrop says the modular nature of the LCS to accomplish the designated mission is perfectly complemented by the Fire Scout and its modular mission payload capability.

However, due to changes in the LCS development schedule, the Navy intends to conduct the Fire Scout Operational Evaluation (OpEval) aboard a ship that will be designated by the US Fleet Forces Command within the next 30 days. Officials say this will provide the fleet with unmanned aerial system support as soon as possible.

According to the current schedule, the Navy will conduct Technical Evaluation on the Fire Scout on the designated ship in the fall 2008 and OpEval in the summer 2009. The Fire Scout will reach Initial Operating Capability soon after OpEval in 2009. The Navy will continue to support LCS Initial Operational Test and Evaluation (IOT&E) efforts in fiscal year 2011.

"This is great news for the Navy and for the Fire Scout," said Doug Fronius, MQ-8B Fire Scout VTUAV program director for Northrop Grumman's Integrated System sector. "It's a win-win situation because the Fire Scout gets to progress through testing and initial operational capability. It will be ready to deploy on operational missions and will be ready when the LCS needs it."

Fire Scout VTUAV restructuring is in the best interests of the Fleet and the US Navy Fire Scout VTUAV program because it enables the Navy to continue supporting LCS integration and will provide a more mature system for LCS deployments.

FMI: www.northropgrumman.com, www.navy.mil

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC