Airbus: No Rush To A330neo | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 24, 2014

Airbus: No Rush To A330neo

Leahy Calls The Idea 'Interesting'

Airbus appears to be in no rush to re-engine its A330 wide body airliner as it get set to launch the A350XWB.

In a media briefing at the company's Toulouse facility last week, Airbus COO, Customers John Leahy (pictured) said "It's an interesting idea," but that there are many factors that would be involved in such a decision, including cost and "potential cannibalization of our A350 program."

In a report appearing in Air Transport World online, Airbus EVP for strategy and marketing Kiran Rao said that there is no need to rush to re-engine the A330 because the current model is selling well. Rao said that the wing is about as efficient as it can be, so any redesign would be all about new engines. "We have been looking to see if the ceo is still more efficient (than a potentially re-engined airplane) and my opinion is yes." Rao said that on flights in the two- to three-hour range, the ceo would be more cost effective overall.

Still, he said that the company is "open to engine suggestions," and that it has not been determined that if the engine would be sole-sourced ... if the project happens at all.

FMI: www.airbus.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC