Boeing Says It Will Ramp Up Production To Meet Customer Demand | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Mar 21, 2010

Boeing Says It Will Ramp Up Production To Meet Customer Demand

Expects To Build More 747s, 777s

Boeing said Friday that it will accelerate planned rate increases on both the 777 and 747 programs. The accelerated rate increases will support increasing customer demand in the recovering airplane market.

B777

"Our customers recognize the great capability and value of the 777 and 747-8," said Boeing Commercial Airplanes President and CEO Jim Albaugh. "Market improvement and our conservatively managed approach to production have put us in a position where we see it necessary to raise aircraft output. Increasing our rate is the right thing to do to support our customers."

The company will accelerate the 777 program's rate increase to seven airplanes per month (from five per month) by approximately six months, from early 2012 to mid-2011. The 747 program's planned production rate increase to two airplanes per month (from 1.5 per month) will move from mid-2013 to mid-2012. Suppliers for both the 777 and 747 will be prepared to support the accelerated rate increases.

B747

"We see 2010 as the year of overall economic recovery within the industry and 2011 a year where airlines return to profitability," said Randy Tinseth, vice president of Marketing for Boeing Commercial Airplanes. "As a result, we anticipate an increase in demand for airplanes in 2012 and beyond."

The current production rate decisions are not expected to have a material impact on 2010 financial results. The company will provide a complete guidance update when it releases first-quarter financial results.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC