Vega To Fly ESA Experimental Reentry Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Dec 20, 2011

Vega To Fly ESA Experimental Reentry Vehicle

Launch Of IXV Planned In 2014 From French Guiana

The launch of ESA's IXV Intermediate eXperimental Vehicle on Europe's new Vega rocket is now in detailed planning, a major step towards the craft's flight in 2014. After launch into a suborbital trajectory from Europe's Spaceport in French Guiana, IXV will return to Earth as if from a low-orbit mission, to test and qualify new critical technologies for future reentry vehicles.

ESA IXV Artist's Rendering

The flight profile calls for the IXV to attain an altitude of around 279 miles, allowing it to reach a velocity of 4.6 miles/second on entering the atmosphere. It will collect a large amount of data during its hypersonic and supersonic flight, while it is being controlled by thrusters and aerodynamic flaps. IXV will then descend by parachute and land in the Pacific Ocean to await recovery and analysis.

ESA and the Arianespace launch provider signed a contract on 14 December to study the launch on Vega, as part of the VERTA - Vega Research and Technology Accompaniment - program.

The rocket's qualification flight planned for liftoff at the end of January will pave the way for the next five VERTA missions that will demonstrate the system's flexibility. At a planned rate of two launches per year, the program will allow the smooth introduction of Vega for commercial exploitation. Following development of critical technologies and completion of the design, the vehicle's manufacturing, assembly, integration and qualification is now under way for a flight window between January and September 2014.

Procurement of the ground network has begun, including the mission control center, ground station telemetry kits, transportable antennas and communication network.

FMI: www.esa.int

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC