AD: Airbus Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Oct 31, 2019

AD: Airbus Helicopters

AD NUMBER: 2019-19-13

PRODUCT: Certain Airbus Helicopters Model EC225LP helicopters.

ACTION: Final rule; request for comments.

SUMMARY: This AD requires determining the total hours time-inservice (TIS) of the free wheel shafts of certain main rotor gearboxes (MGBs), replacing the MGB or right-hand side (RH) free wheel shaft, installing placard(s), and revising the Rotorcraft Flight Manual (RFM) for your helicopter.

This AD was prompted by a report of wear of the ramps of the RH free wheel shaft.

DATES: This AD becomes effective November 5, 2019. The FAA must receive comments on this AD by December 20, 2019.

COST: The FAA estimates that this AD affects 23 helicopters of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Labor costs are estimated at $85 per work-hour.

Determining the hours TIS of each free wheel shaft takes about 0.25 work-hour, for an estimated cost of $21 per helicopter and $483 for the U.S. fleet.

Installing placard(s) and revising the RFM for your helicopter takes about 0.5 work-hour for an estimated cost of $43 per helicopter. Replacing an MGB takes about 40 work-hours and parts cost about $850,000 (overhauled), for an estimated cost of $853,400.

FMI: AD

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC