New Glass For KC-135 Tankers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Apr 23, 2010

New Glass For KC-135 Tankers

ARINC To Start Upgrades Under Air Force Block 45 Program

As the Air Force gets ready to evaluate bids for a tanker to replace the KC-135, the existing aircraft are still flying daily, and need to be kept as up-to-date as possible. ARINC Engineering Services, LLC announced Wednesday it has contracted with Rockwell Collins to perform the initial installations of the Block 45 avionics upgrade on the U.S. Air Force's tanker fleet.

The installations will begin in early 2011 with two prototype EMD (Engineering and Manufacturing Development) airframes.

Many of the KC-135 aircraft date from the 1960s, and all are expected to receive Block 45 upgrades over time. The upgrades include a new autopilot/flight director, radar altimeters, removal of 21 analog instruments, and a modern large-format color digital engine instrument display in the cockpit.

ARINC will perform the work at its aircraft modification facility near Tinker Air Force Base in Oklahoma City. ARINC currently operates the largest commercial hangar in the area and has facility expansion plans in the works for current and projected workload.


File Photo

"ARINC is proud to partner again with Rockwell Collins on vital systems upgrade work for the KC-135 aircraft," stated Jeffery D. Willis, Engineering Director, ARINC Aircraft Integration & Modification Defense Programs. "We already have a strong work portfolio with Rockwell Collins, including Block 35 GATM installations for "Open Skies" surveillance aircraft, and Block 40 Circuit Breaker Replacements using kits fabricated at our own facility."

Phil Jasper, Vice President and General Manager of Mobility and Rotary Wing Solutions for Rockwell Collins, stated "The Block 45 upgrade continues Rockwell Collins' role in transforming the KC-135 by replacing obsolete components with the latest digital avionics for increased safety, efficiency and reliability. As the prime contractor for the KC-135 Global Air Traffic Management (GATM) program, we've had a very successful history of delivering these upgrades for the Air Force on time and on budget."

FMI: www.arinc.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC