Report: Ohio Airport Doesn't Meet FAA Standards | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Nov 25, 2008

Report: Ohio Airport Doesn't Meet FAA Standards

More Money Needed After $2.3 Million Investment

Ohio's Warren County Board of Commissioners has been hustling to bring the local airport into compliance with FAA standards, but it may have lost a race with a recession.

The Cincinnati Enquirer reports about $2.3 million has been spent in the last two years to clear trees and demolish buildings that lie within what should be the buffer zone for runway 1/19 at Warren County Airport (I68) near Lebanon.

Because of inattention to zoning laws, development has encroached on the airport. Many of the buildings were reportedly built without permits.

As a result, night landings became "really a thrill," to quote local pilot and Airport Authority President Bill Simmons. The runway is equipped with four-light precision approach path indicators, but Simmons notes, "...you wouldn't see the trees until you picked them up in your landing lights."

The FAA is willing to reimburse the county up to 95 percent for the required improvements if they're completed on schedule. Simmons says about 70 percent of the work is complete. The airport has asked for another $1.9 million in the 2009 budget to finish the job, but the county, like most, faces intense budgetary pressures in the recession.

Commissioners are expected late this month to approve a final 2009 budget calling for the smallest increase in spending in more than a decade.

County Commissioner Pat South says,"We hope the FAA will recognize that we are proactively going after this, but because of the circumstances of the economy, some things might take longer than we'd like."

FMI: www.warrencountyairport.com/

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC