Sikorsky Strategy Fits Budget Realities | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Nov 28, 2011

Sikorsky Strategy Fits Budget Realities

Company's Self-Funded S-97 May Be Timed Just Right

With news this week that the deficit supercommittee will end in deadlock, triggering automatic cuts in defense spending, Sikorsky's decision to spend its own money to develop the X2 and its military helicopter extensions is looking downright prescient. The company appears to be betting that future helicopter procurement will be bracketed by tight budgets and a need for speed.

Earlier this year Sikorsky tested its X2 Technology Demonstrator, which uses rigid coaxial rotors and a pusher propeller, at speeds up to 250 knots, or 287 MPH. The machine was then retired and presented as a static display at Oshkosh. This month, a mockup of the first proposed military derivative, the S-97 Raider, (pictured in manufacturer photo,) was shown to US Army officials at Fort Bragg, North Carolina, which is home to Army Special Ops Aviation.

The Fay Observer reports that when the actual, flying prototypes are ready, they will tour installations including Fort Bragg, Fort Campbell, Kentucky and Fort Hood in Texas to let military pilots fly the machines and see the difference speed makes. The X2's 250 knots is a whopping 47 percent faster than a Black Hawk. The S-97 Raider is proposed as a light tactical helicopter with multi-role applications, able to carry six assault soldiers, an internal fuel tank, a .50-caliber machine gun or rockets.

In addition to allowing higher speeds, Sikorsky says the suite of technologies demonstrated on the X2 will also make the S-97 quieter, more maneuverable, better in high-and-hot missions common in places such as Afghanistan, and do it all with less workload for single-pilot use.

Sikorsky spokesman Mike Mudd tells the Observer that in 2004, just about the time the Pentagon was canceling Sikorsky's contract to develop the Comanche helicopter for delays and budget overruns, the company looked at long-term strategy.

Mudd recalls, "We decided about eight years ago how do we remain competitive in the future, 30 or 40 years? We want to do everything that the helicopter provides us, but we think the customer is going to desire speed.

"We put a small team of engineers, about 20 to 30 of them (on the project) and said, 'Go figure this problem out. Keep a helicopter, but add the higher speed to it.'

"We want to make sure one guy can fly it and flying is secondary and running a mission is primary."

FMI: www.sikorsky.com/StaticFiles/Sikorsky/Assets/Attachments/NEWSLETTER/military/Frontlines_Q4_2010_issue22.pdf

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC