AD: Cessna | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 02, 2003

AD: Cessna

AD NUMBER: 2003-09-09
MANUFACTURER: Cessna, Reims Aviation
SUBJECT: Airworthiness Directive 2003-09-09
SUMMARY: This amendment supersedes Airworthiness Directive (AD) 2002-09-13, which currently requires a one-time inspection of the fuel boost pump wiring inside and outside the boost pump reservoir and repair or replacement of the wiring as necessary on certain Cessna Aircraft Company (Cessna) Model 441 airplanes. AD 2002-09-13 resulted from several reports of chafing and/or arcing of the fuel boost pump wiring inside and outside the fuel pump reservoir. This AD retains the actions required in AD 2002-09-13, makes the one-time inspection repetitive, requires the inspection and possible replacement of the wire harness, lead wires and fuel boost pump on Model F406 airplanes, and requires eventual installation of an improved design wire harness andfuel boost pump as terminating action for the repetitive inspections. The actions specified by this AD are intended to detect, correct, and prevent chafing and/or arcing fuel boost pump wiring, which could result in arcing within the wing fuel storage system. Such a condition could lead to ignition of explosive vapor within the fuel storage system.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20030909

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC