AD: Raytheon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Nov 11, 2004

AD: Raytheon

AD NUMBER: 2004-23-02
MANUFACTURER:
Raytheon
SUBJECT: Airworthiness Directive 2004-23-02
SUMMARY: The FAA supersedes Airworthiness Directive (AD) 87-22-01 R1, which applies to certain Raytheon Aircraft Company (Raytheon) 65, 90, 99, 100, 200, and 1900 series airplanes, and Models 70 and 300 airplanes. AD 87-22-01 R1 currently requires you to repetitively inspect the nose landing gear (NLG) fork for cracks. If cracks are found that exceed certain limits, AD 87-22-01 R1 requires you to replace the NLG fork with a serviceable part or an improved NLG fork (Kit No. 101-8030-1 S or Kit No. 114-8015-1 S, as applicable). Incorporating an improved NLG fork kit terminates the repetitive inspection requirements. This AD is the result of FAA's policy (since1996) to disallow airplane operation when known cracks exist in primary structure. This AD retains the inspection requirements of AD 87-22-01 R1, requires you to incorporate an improved NLG fork kit anytime a crack is found, and adds additional airplanes to the applicability section of this AD. We are issuing this AD to detect and correct cracks in the NLG fork, which could result in reduced structural integrity and inability of the NLG fork to carry design limit and ultimate loads.The reduced residual strength may cause separation failure of the NLG fork, which could result in loss of control of the airplane during take off, landing, and taxi operations.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20042302

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC