AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne Unlimited-11-12-18

Airborne Unmanned-11-13-18

Airborne Unlimited-11.07.18

AMA Drone Report-11.08.18

Airborne Unlimited-11.09.18

Airborne-YouTube

Airborne Unlimited-11-12-18

Airborne Unmanned-11-13-18

Airborne Unlimited-11.07.18

AMA Drone Report-11.08.18

Airborne Unlimited-11.09.18

Thu, Jul 12, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-14-04

PRODUCT: Certain Airbus Model A330- 200 Freighter, A330-200, A330-300, A340-200, A340-300, A340-500, and A340-600 series airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a determination that a functional test to ensure that there is no blockage of vent pipes was not done on the trim tank of certain airplanes during production.

This AD requires doing a trim tank functional test, and corrective actions if necessary.

DATES: This AD is effective August 13, 2018.

COST: The FAA estimates that this AD affects 97 airplanes of U.S. registry. The costs of compliance are estimated as follows:

  • Functional test - $1,360 per aircraft for up to 16 hours labor
  • Inspections - $170 per aircraft for two hours labor
FMI: AD

Advertisement

More News

Airborne 11.09.18: Global 7500 Cert, 737 MAX Emergency AD, V1 'Flying Bomb'

Also: Trig European Office, Sonoma Jet Center, Sikorsky Award, Airbus A330-800 Flies The FAA has certified the Bombardier Global 7500. It will enter into-service later this year. E>[...]

ANN's Daily Aero-Linx (11.11.18)

Aero Linx: Wings of Hope Wings of Hope is a global humanitarian charity that has been helping the world’s poor since 1962. As our name suggests, we use our wings to deliver r>[...]

Aero-News: Quote of the Day (11.11.18)

"Enough is enough. Air Wisconsin Flight Attendants are ready to do whatever it takes to get a new contract. We have made every sacrifice to ensure the stability of the airline whil>[...]

ANN's Daily Aero-Term (11.11.18): Hold-Short Point

Hold-Short Point A point on the runway beyond which a landing aircraft with a LAHSO clearance is not authorized to proceed. This point may be located prior to an intersecting runwa>[...]

Aero-Help Wanted: ANN REALLY Needs A Sales Pro

ANN/Airborne/Aero-TV Marketing Department Needs Part or Full Time Personnel E-I-C Note: For some reason, finding really motivated/honest/professional sales help has been a tough gi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC