DAB Receives $2 Million Grant To Upgrade ILS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Mar 13, 2006

DAB Receives $2 Million Grant To Upgrade ILS

Will Replace 22-Year-Old System Over Two Years

Daytona Beach International Airport officials have accepted a $2.37 million federal grant, which will be used to cover almost all the costs of upgrading the airport's antiquated ILS.

Deputy US Transportation Secretary Maria Cino presented the grant Friday, saying it would cover 95 percent of the cost of an upgraded ILS. The airport and state will split the remaining 5 percent.

"It really comes down to being able to land an airplane in any kind of weather or darkness," Cino told a gathering of airport officials and County Council members.

Those are duties the current 22-year-old system, which is losing signal strength. The FAA downgraded its reliability from 25 miles down to 10, based on the results of a 2003 safety check -- and while emergency repairs later restored the full 25-mile service radius, it was clear the solution was only a stopgap measure.

The current ILS serves the 10,500-ft Runway 7-Left. The new system will be installed at the opposite end of the runway, airport marketing director Steve Cooke told the Daytona Beach News-Journal.

Officials expect the installation of a new ILS will take about two years.

FMI: http://volusia.org/airport/default.htm

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC