First Flight: Express Series 2000RG | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 06, 2003

First Flight: Express Series 2000RG

Express Aircraft Company, LLC. (EAC) has conducted the successful first flight of their new Series 2000RG model aircraft. 

Piloted by Mr. Larry Olson, EAC President, the Series 2000RG took off January 17th, 2003, at 1400 PST, flying the test plan for approximately forty-eight minutes. The flight was a success and all items on the flight test plan were completed.

This aircraft is powered with a Pratt & Whitney PT6A-20 turbine engine production 550hp. The turbine engine is an option along with either a Continental TSIO-550 or a Lycoming TSIO-540. The aircraft is very well equipped, the chic panel sports a dual Chelton Synthetic EFIS system, a full UPS Aviation center stack, an S-Tec 55x autopilot system, and a Kenwood CD Player with Sirius Satellite Radio.   

EAC manufactures two high-performance four-place kit aircraft; the fixed tricycle gear Series 2000FT and the retractable gear Series 2000RG. Pricing on the FT kit is $48,900 and the RG kit is $62,500.  Both aircraft have 140 gallons of fuel capacity, the FT cruises at 200mph and the RG is projected to cruise at 300mph. EAC claims that the Express is the most spacious aircraft in its class and is a true four-place in both space and useful load.

Express Aircraft also believes it has revolutionized the kit aircraft industry with their Builder Assist and Factory Finish programs. The Builder Assist program lets the builder complete over 51% of their construction at the EAC factory in just three-two week sessions. The Factory Finish program completes an aircraft to a turn-key product after the builder is has completed the Builder Assist program.

FMI: www.express-aircraft.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC