A350 XWB Landing Gear Systems Test Facility Opened In The UK | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Oct 13, 2010

A350 XWB Landing Gear Systems Test Facility Opened In The UK

About 30 People Will Be Tasked With Landing Gear Work

An A350 XWB Landing Gear Systems Test Facility has opened at the Airbus site in Filton in the UK. Louis Gallois, chief executive officer of EADS, Airbus' parent company, and Sir Peter Westmacott, the UK ambassador to France, opened the building, which is named after Sir George White, the founder of the Bristol Aeroplane Company.


Airbus A350 XWB Artist's Concept

"Today we are not only opening an important new building, but we are also celebrating a closer step to the reality of the A350 XWB," said Gallois. "This facility, and the employees inside it, will play an important part in the integration of the landing gear systems on the aircraft, which will fly around the world and carry millions of passengers in its lifetime. I am proud that the Airbus employees in the UK will play such an important role in this program."

Construction of the EUR39m facility started in January 2009. Inside there is a large bay that will house  the landing gear systems integrated rigs (LG0), an avionics suite with test benches known as the Landing Gear Systems Functional Integration Benches (FIB), a control room from which all tests are co-ordinated, a parts store and a dedicated viewing area for visitors.

In line with Airbus' environmental requirements, this building uses innovative technology to reduce the environmental footprint of the building. This includes natural light and temperature monitoring systems which will ensure that just the right amount of energy is used to heat and light the building.

Approximately 30 full-time employees will work in the landing gear systems test facility when the rigs enter the initial test phase in mid-2011. The Airbus site at Filton is responsible for the specification, procurement, aircraft integration and certification of all Airbus aircraft landing gear and associated systems. The test facility will demonstrate the maturity of the landing gear system, and provide evidence for the certification of the landing gear and systems, especially the extension-retraction and braking systems.

FMI: www.airbus.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC