The Dreamliner Gets Its Wings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 16, 2007

The Dreamliner Gets Its Wings

No, It Hasn't Flown Yet... We Mean Literally

The gigantic composite wings for the upcoming Boeing 787 Dreamliner were delivered to Everett early Tuesday morning, adding another piece to the assembly puzzle now underway in the Seattle suburb.

Manufactured by Mitsubishi Heavy Industries at its facility in Nagoya, Japan, each wing is 98 feet long. Standing on edge in custom-made tooling, the wings were delivered together to Boeing via the Dreamlifter, a specially modified 747-400 used to transport 787 major assemblies.

Boeing says the 787 is the first commercial aircraft to use composite materials as its primary structure. It is also the first Boeing aircraft to sport an all-composite wing.

"A composite wing of this size has never been built before," said Scott Strode, 787 vice president of Airplane Definition and Production. "This is a tribute to our fantastic team. We believe the Dreamliner sets a new standard for how commercial airplanes will be made in the future."

The wings were immediately delivered to the 787 final assembly factory in Everett. Additional work -- including attaching the wingtip and movable surfaces -- will be completed by Boeing. The total wingspan of a 787 is 197 feet.

Boeing touts the 787 Dreamliner as the fastest-selling airplane in aviation history, with firm orders for 567 airplanes from 44 airlines. The first public rollout of the plane is scheduled for July 8, 2007... and ANN will be there!

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC