Rocket Motor For Ariane 6 And Vega-C Is Cast For Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 20, 2017

Rocket Motor For Ariane 6 And Vega-C Is Cast For Testing

P120C Is Largest Solid-Propellant Rocket Motor Ever Built

The first full-scale model of the rocket motor that will propel Ariane 6 and Vega-C into orbit has been cast and filled with inert propellant for testing at Europe’s Spaceport in French Guiana. The P120C is the largest solid-propellant rocket motor ever built in one segment.

Each P120C will hold over 140 metric tons of propellant in a carbon fibre casing almost 11.5 m long and about 3.4 m in diameter. It is derived from Vega’s current first stage motor, the P80, which holds 88 metric tons of propellant. The design builds on existing expertise and lessons learned with Vega’s P80, and it increases Vega performance with Vega-C. Two or four P120Cs will be strapped onto Ariane 6 as boosters for liftoff.

The model casing, shipped this summer from Avio in Italy, took about 36 hours to fill with inert propellant blended at Europe’s launch base in Kourou.

Using non-ignitable fluid that has a similar density to the real propellant meant that engineers could safely test all the new equipment and procedures. Filled and sealed, the fluid in the casing could stabilise, cool and harden – the curing process – which took 10 days.

Further tests on the motor, now horizontal, will confirm that it is ready to be integrated with other structures in January. These tests are a step towards casting active propellant in November with a P120C development motor that will be static fired in April.

Vega-C is expected to debut in mid-2019, increasing performance from Vega’s current 1.5 t to about 2.2 t in a reference 700 km (435 mile) polar orbit. Ariane 6’s maiden flight is planned for 2020. This new launch vehicle will be gradually phased in to succeed Ariane 5.

(Image provided with ESA news release)

FMI: www.esa.int

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC