NTSB Issues Second Update On British Airways Engine Fire At Las Vegas | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Oct 07, 2015

NTSB Issues Second Update On British Airways Engine Fire At Las Vegas

Finds A Portion Of The Stage 8-10 Spool Failed

As part of its ongoing investigation into the September 8, 2015, engine fire during takeoff of British Airways flight 2276, a Boeing 777, at McCarran International Airport, Las Vegas, the NTSB has released additional information about the uncontained engine failure.

NTSB investigators disassembled and documented the GE90 engine at the GE facility in Evandale, Ohio. Group members from the FAA, GE, and Boeing, along with the United Kingdom’s accredited representative from the Air Accidents Investigation Branch and their technical advisor, British Airways, were in attendance.

Engine examination revealed that a portion of the stage 8-10 spool in the high-pressure compressor (HPC) section had failed, liberating fragments that breached the engine case and cowling. Additional pieces of the HPC spool were recovered from inside the engine and retained for metallurgical examination.

The NTSB Materials Laboratory examined engine parts gathered from the scene. HPC parts recovered during the disassembly of the engine were examined at the GE facility. All pieces of the damaged stage 8 disk rim have been collected.

The fracture initiated in the HPC stage 8 disk web, a part of the stage 8-10 spool. The NTSB will continue metallurgical evaluations of the disk and the fracture features.

The NTSB said GE is performing high-priority, focused inspections of HPC hardware from other GE90 engines. The inspection data is being gathered to support the investigation and to determine further investigative actions.

Additional updates will be provided as new factual information is developed.

(Source: NTSB news release. Image from file)

FMI: www.ntsb.gov

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC